Finding: Clarksville Middle School: Student Services Office Room 36 (FXXCMS2022001FFC)

Finding Type
Holes/Penetrations in Wall
Remediation

Building Maintenance utilized a contractor to perform the following exterior repairs to the Student Services addition:

  • Re-adhered the exterior siding with screws instead of nails.
  • Caulked the joints where each panel meets. 
  • Installed a z-channel on the horizontal joint to divert rain water into the trench drain below.
  • Installed a drip edge at the bottom of the paneling to divert rain water into the trench drain below.
  • Re-set the trench drain with paver base to limit future movement. 
  • Sealed the hole in the mortar outside of Room 39. 
  • Sealed a crack in the block wall in office where the picture frames were identified.
  • Sealed the "daylight" observed around the perimeter of the addition from the inside. 

The above work began on September 30, 2022 and was completed on October 24, 2022. 

Additionally, Building Maintenance will be re-grading areas outside of the addition to facilitate better drainage. This work is planned to occur in the next few weeks.

Location
Student Services Office Room 36
Tracking Number
FXXCMS2022001FFC
Assigned To
Building Services
Work Orders
#259521
(Complete)
Closed
Yes
Completion Date