Finding Type
Elevated moisture per moisture meter
Comments
A leak was identified above the drywall bulk head (bubbling paint). Building Maintenance to address the leak and then re-paint.
Location
Main Hall Outside of
Tracking Number
FXLKMS202300277B
Assigned To
Building Services
Work Orders
#4511
(Complete)
Closed
Yes
Completion Date