Finding: St. John’s Lane Elementary School: Girl's Restroom Outside POD Containing Rooms 103 - 107 (FSJLES2022001F8E)

Finding Type
Elevated moisture per moisture meter
Remediation

Building Maintenance removed impacted drywall against cement block wall in girls' restroom in POD 103 - 107 to allow block wall dry out.  Then replaced the length of the base of the drywall at least a foot high.  Then the remaining restrooms with ceramic floor tile and drywall were addressed by replacing the base (~4") of the drywall.  The drywall base was replaced with a water resistant product.

Location
Girl's Restroom Outside POD Containing Rooms 103 - 107
Tracking Number
FSJLES2022001F8E
Assigned To
Building Services
Work Orders
#227642
(Complete)
Closed
Yes
Completion Date