Finding: Ellicott Mills Middle School: Portable 125 (FXEMMS2021001F31)

Finding Type
Visible mold (leak)
Remediation

Building Services utilized a contractor to evaluate, correct, and repair the damaged wall cavity.  The contractor removed siding to access and replace damage framing, insulation, drywall, and flooring.  The area leaking was flashed.  The work order was was closed September 8, 2021.

Location
Portable 125
Tracking Number
FXEMMS2021001F31
Assigned To
Building Services
Work Orders
#201386
(Complete)
Closed
Yes
Completion Date