Finding Type
              Visible mold on surfaces due to elevated relative humidity/dew point
          Remediation
              A board-approved restoration contractor removed the existing fiberglass insulation above the drop-ceiling and discarded it. The wood framing above the drop-ceiling was cleaned. The plywood decking was then dried before moving to the next phase of the project, which included encapsulation of the wood framing. After work was complete, surfaces (desks, chairs, tables, etc.) were cleaned as a precaution. Work began on August 7, 2020 and was completed on August 28, 2020.
Location
              Portable Villa
          Tracking Number
              FXTSES2020001ED4
          Assigned To
              Environmental Services
          Closed
              Yes
          Completion Date