School
Assessor
Christopher Madden
Date
Outdoor Temperature
73°F
Relative Humidity
87%
Outdoor Dew Point
69°F
Air Handling Unit (Assess representative sample of RTU/AHU, including Portables)
Check | OK | Comments |
---|---|---|
Tag Number | ||
Displayed
|
Yes
|
|
Status | ||
Running
|
Yes
|
Check | OK | Comments |
---|---|---|
Outdoor Pollution | ||
Free from pollution sources w/i 25 ft. (e.g. dumpster, chimney, etc.)
|
Yes
|
|
Louvers and Access Doors | ||
Operating properly
|
Yes
|
|
Deflectors & Screens | ||
Present
|
Yes
|
|
No debris
|
Yes
|
|
Dampers | ||
Outside air damper: no obstructions
|
Yes
|
|
Return air damper: no obstructions
|
Yes
|
Check | OK | Comments |
---|---|---|
Clean | ||
No excess dirt, not used for storage
|
Yes
|
|
Insulation | ||
Secure and Clean
|
Yes
|
|
P-Trap (if present) | ||
Charged with liquid
|
Yes
|
Check | OK | Comments |
---|---|---|
Filters | ||
Free of any bypassing
|
Yes
|
|
Correct size
|
Yes
|
|
Free from excessive loading, dampness or odor
|
Yes Work Order Closed by Building Maintenance
|
RAHUE 4, 6, 9, and RTU-11 and 12 - Pre filters heavily loaded. The filters indicate they were last changed June 2023.
RAHUE-8 - Moderate loading on the pre-filters.
The pre-filters are slated for replacement in June 2024.
|
Not collapsed/not fallen off
|
Yes
|
|
Present (not missing)
|
Yes
|
|
Date and initials written
|
Yes Work Order Closed by Building Maintenance
|
RAHU-4 and 8 - No initials or date, however the remaining filters in other units are dates and assumed to be the same.
|
Heating Coils | ||
Clean, no noticeable leaks, or obstructions
|
Yes
|
|
Cooling Coils | ||
Clean, no noticeable leaks, or obstructions
|
Yes
|
|
Access: Free of any obstructions in area that may affect access
|
Yes
|
|
Condensation: No excess condensation problems
|
Yes
|
|
Blowoff: Free of water from coil blowoff
|
Yes
|
|
Condensate Pan and Drain Line | ||
No visible bacterial or fungal growth
|
Yes
|
|
Clean, no residue, no standing water
|
Yes
|
|
No Overflow, leakage, blockage, or damage
|
Yes Work Order Closed by Building Maintenance
|
RAHU-6 - The condensate drain is leaking water onto the roof.
|
Proper slope, drain line ok, drainage acceptable, discharge okay
|
Yes
|
Check | OK | Comments |
---|---|---|
Condition | ||
Operational
|
Yes
|
|
No unusual odors, noise, or vibration
|
Yes
|
Check | OK | Comments |
---|---|---|
Heating Central Plant | ||
Boiler operational
|
Yes
|
Check | OK | Comments |
---|---|---|
Thermostat | ||
Thermostat setting acceptable
|
Yes
|
|
Thermostat cover
|
Yes
|
|
Fan Mode Correct
|
Yes
|
|
Space Temperature Acceptable
|
Yes
|
Work Order Number(s)
26011
Issues found durring this assessment have been assigned to the above