Finding Type
Elevated moisture per moisture meter
Remediation
A work order was created for building services to address the missing and water stained pipe insulation above the drop-ceiling.
Location
Room 15 on the Head Start corridor as well as a couple of other places.
Tracking Number
FXXOCL20190011EB
Assigned To
Building Services
Closed
Yes
Completion Date