Finding: Glenelg High School: Media (FXXGHS2018000005)

Finding Type
Elevated moisture per moisture meter
Remediation

A board approved restoration contractor was contacted to assist in drying impacted materials. Fans and dehumidifiers were placed in the area of impact to facilitate the drying process. The equipment was left in place for three days.

Bookshelves were removed from the wall to facilitate drying behind the shelves. 

Impacted ceiling tiles were removed and disposed of.

Books were separated and dried by Custodial Services.

Location
Media
Tracking Number
FXXGHS2018000005
Assigned To
Environmental Services
Closed
Yes
Completion Date