Finding: Dunloggin Middle School: Portable 46 (FXXDMS201800022C)

Finding Type
Visible mold (leak)
Remediation

Building Services rendered services of a contractor to assess and make necessary repairs.  The work could not be scheduled or completed prior to the start of the school year.  The school made arrangements to move the class within the main portable until work could be scheduled and completed.

Work consisted of:

  • installing new door (head filler, seal, flashing)
  • removing and replacing wet / rotten materials (i.e. floor joist, subfloor, sill plate, studding, insulation, and drywall)
  • removed and replaced old window jambs and seal windows as appropriate
Location
Portable 46
Tracking Number
FXXDMS201800022C
Assigned To
Building Services
Closed
Yes
Completion Date