Finding: River Hill High School: Penthouse (FXRHHS2020001EFB)

Finding Type
Elevated moisture per moisture meter
Remediation

Building Services did the following as a result of the incident:

Repaired the cause and inspected all air handling for similar issues. 

Inspected for and sealed possible voids from the penthouse to the below occupied area.

Evaluated floor drains within the penthouse.

Made repairs to impacted building materials.

Location
Penthouse
Tracking Number
FXRHHS2020001EFB
Assigned To
Building Services
Work Orders
#173975
(Complete)
#174038
(Complete)
#174069
(Complete)
#174112
(Complete)
#174224
(Complete)
#174229
(Complete)
#174346
(Complete)
#174347
(Complete)
Closed
Yes
Completion Date