Finding: Long Reach High School: stadium press box (FXLRHS2022001F7F)

Finding Type
Elevated moisture per moisture meter
Remediation

Building Maintenance assessed the situation and determined to utilize a contractor to remedy.  As of this IEQ report, the interior of the press box was demoed (leaving exterior building envelope intact) and awaiting roof repairs/ensuring no leaks.  The shell (metal) of the press box will only exist with no new interior finishing (i.e. drywall and ceiling tile).

Location
stadium press box
Tracking Number
FXLRHS2022001F7F
Assigned To
Building Services
Work Orders
#221459
(Complete)
Closed
Yes
Completion Date