Finding Type
Relative humidity above 70%
Remediation
Building Maintenance (HVAC) corrected the controls issues and verified that system was operating correctly.
Stained ceiling tiles and water damaged insulation due to condensation to be replaced.
Location
Room 110
Tracking Number
FXXGHS2026002DB4
Assigned To
Building Services
Work Orders
#114264
(In Progress)
Closed
No